Site logo

  • maui a'kai
  • design studio
  • journal
  • galleries
  • about us
  • resources
  • t-plan
  • contact
© 2015 mauiakai contact us
  • maui a'kai
  • galleries
  • framing shed4
IMG_2372

IMG_2376

IMG_2374

IMG_2389

IMG_2405

IMG_2409

IMG_2437

IMG_2445

IMG_2449

IMGP2354

IMG_2479

IMG_2491

IMG_2494

IMG_2472

IMG_2484

IMG_2486

IMG_2489

IMG_2500

IMG_2504

IMG_2508

IMG_2511

IMG_2517

IMG_2521

IMG_2524

IMG_2528

IMG_2529

IMG_2545

framing cottage outside done...

We nearly completed the main framing of the shed exterior, next was to start finishing the interior. We were 2 boards short on the exterior, but no worries we had more important things to do in the inside. We started building the timber framing walls for the bathroom and the main wall between the living area and the workshop. Meanwhile our Biolytix waste water system was being installed. We had to use a
"porta-potty" while the work was being completed and feed the worms compost to keep the system going until that "first flush". We keep busy insulating, wiring, plumbing the interior walls as our living area begins to take final form. Our combat camera got a battle wound when a big gust of wind took it down the hill... it's in for repair! (Consume less, repair and re-use!)